Place a new item
Pick a type, then tap the map. Cables are drawn point by point and snap to nearby vaults, pedestals and the hub. Conduit is drawn start to end, so you can log a bore the day it's done.
New items start as Proposed in the working project. Change the stage from the item's record as work moves along.
Everything saves automatically and shows up for the rest of the team within about 20 seconds.